A contract administrator on every job, 24/7. Rory catches the extras, keeps every job moving, and tells you what needs you first.

Rory catches the extras, keeps every job moving, and tells you what needs you first.

Rory
DM Dave Mercer
Mercer Built
Inbox
6 need you
Needs me Everything
Filter
Money at risk 2
Cost review High You're the blocker
$14,200
Supplier quote for marble benchtops, never logged
Kitchen Retrofit · Mike · 25m ago
Variation Medium
$4,200
New mesh callout on S-04 rev C, not in AroFlo
Kitchen Retrofit · from the engineer · 6h ago
Replies to send 1
Reply needed
$3,800
Sparks Electrical, switchboard quote
Office Fit-out · chased twice · 4h ago Send reply
Inbox
Cost review High You're the blocker
Supplier quote for marble benchtops, $14,200
Kitchen Retrofit From Mike 25m ago
At stake $14,200
Mike's quote Not in the contract
Rory's take This never made the claim. Log it against Kitchen Retrofit and put it on the next invoice, with Mike's email still attached.
Rory's plan Edit plan
1 Log the variation against Kitchen Retrofit AroFlo · Job #KR-2024 · $14,200 AroFlo Ready
2 Add it to the next progress claim So it lands on an invoice, not a memory Claim Ready
Approve, Rory runs the plan Nothing is sent until you approve.
Bubble up Resolve Dismiss
Running now
Kitchen Retrofit · $14,200
Logging the extra. Nothing sent without you.
Variation logged against Kitchen Retrofit AroFlo · Job #KR-2024 · $14,200 · Mike's email attached
Adding it to the next progress claim So it hits an invoice, not a sticky note On the next claim · logged
AroFlo Claim #7 Logged
Caught $14,200 Kitchen Retrofit · on the next claim · email attached
Marble benchtops, never in the contract $14,200
Mesh callout caught on S-04 $4,200
Sparks Electrical chased $3,800

Nobody asked Rory for any of this. Not one of these rows was logged by a person.

Sits on AroFlo or Buildxact, and the inbox you already live in. No migration.

AroFloBuildxactMicrosoft 365Google WorkspaceXero
The problem

You're working for free.
You just can't see it yet.

Unwritten work never announces itself. It's a sentence four replies into a thread, a drawing with nothing marked, something said in a meeting, a walkthrough nobody followed up. By claim day it's just work you did.

Meet Rory

A contract administrator on every job you're too busy to watch.

It reads everything on the job the way a contract administrator would, and has the next step written before you get to it. The hire a growing builder could never justify.

Variation High You're the blocker
Extra circuits agreed by email, not in AroFlo yet. Priced.
Read against the job · 2h ago

It catches extras before they slip

A client agrees to extra work in an email. Rory logs it against the job, prices it, and puts it on the next invoice.

Notice High
Variation notice window closes in 2 days. Draft ready.
Contract clock · nothing sent yet

It gets the notice in on time

Variation and delay notices drafted inside the contract's window, so the claim still stands.

Chase Medium
Sparky hasn't confirmed Monday. Chase written.
Waiting on others · you tap send

It keeps every job moving

The sparky hasn't confirmed, a certificate is outstanding, a client is waiting on a reply. The chase is written before the job stalls.

One extra

A client emails a change.
You either invoice it, or you wear it.

The same extra, twice. What happens today, and what happens when Rory's watching.

Client · mobileTue 7:42am

"Mate, while you're in there, can you move the door across a bit and run the power to the other wall?"

One of eighty that day

You read it between two other things and reply "no worries".

Site, same afternoonNot priced
Door moved 600mm westno VO
Power run to the far wallno VO
Sparky's afternoon, plus materialson you

Nobody's careless. It just never became a record while it was fresh.

Day 5Notice window closed
Notify the client in writingmissed
Price it and get it approvedmissed

The contract gave you five days. Nothing told you the clock had started.

Progress claimDisputed
Base contract works✓
VO-01 · ensuite tiles✓
Door and power??

"I never approved that." Nothing to point at, so you wear it.

Client · mobileTue 7:42am

"Mate, while you're in there, can you move the door across a bit and run the power to the other wall?"

One of eighty that day
Variation High You're the blocker
Door moved and power run to the far wall. Not priced yet.
Read against the job · 7:44am
Rory's plan · 3 steps
1 Price it against the electrical package From the rates you gave Rory
2 Draft the notice to the client Dated inside the contract window
3 Attach the evidence The email, and the site photos
Approve and send all 3 Nothing leaves Rory until you press this.
Bubble up Resolve Dismiss
Progress claimApproved
Base contract works✓
VO-01 · ensuite tiles✓
VO-02 · door and power✓

Approved 7:50am, from the ute. The email, the notice and the photos are on the claim with it.

Through the day

The extra shows up all day. Rory's already on it.

You run the job. Rory handles the paperwork around it: on site, on the drawings, in the quote you haven't started.

Each morning

You start the day. Rory already ranked what needs you.

It ranked the inbox overnight. The extras that need you are on one page.

Inbox

You get the email. Rory already priced it.

Rory reads it against the job. It's already a priced variation, ready for your yes.

Meetings

You hold a meeting. Rory follows up.

Record it. The transcript goes to everyone. Extra steel is a variation, and the chase to Dave is already written.

Field note

You leave a note. Rory files it and chases the work.

Say it on site. The crack at the garage is raised as an extra, and the chase to the sparky is written.

Site walkthrough

You walk the job. Rory aims the emails.

Take photos as you go. The insulation email is ready for the subbie, and the extra is on the claim.

Drawings

You open Rev C. Rory already marked what moved.

Compared overnight against last night's set: who comes back, and what it costs.

Quote

You put the quote off. Rory already wrote it.

Drafted from what you've charged and the supplier list. Where there's no cost on file, it says so.

In build now

You miss the call. Rory picks up and puts it on the job.

It knows who's ringing and which job they're on, answers what's safe, and logs the rest. The rough-in move is already a note on Henley, waiting on you.

Trying it

Try it on one job.
Keep it only if it helps.

No slides and nothing to install. You'll know within a few weeks whether it's worth having.

Kosta Canatselis

A chat with Kosta

Founder of Rory. Ask him anything.

30 min
  1. This week

    A look at one of your jobs

    Kosta looks at how you run things, the jobs, the inbox and your system, and shows you where Rory would fit.

  2. Next few weeks

    Rory on one live job

    Beside the system you already use. You see what it catches, and nothing goes out unless you say so.

  3. Then

    Your call

    Keep it if it's earning its place. If it isn't, you stop. That's a useful answer too.

No migration, no sales process, no pressure.

Start here

See the demo
on one of your jobs.

We'll show you where the extras are slipping, and where Rory would catch them.

Early birdCome in early and the rate you start on is the rate you keep. See pricing.

See Demo Join Waitlist

One scenario. Alongside your current system. A few weeks. Nothing sends without you.

A timber-framed house and a ute on site at dusk.
6:40pmstill on site
Running it

More jobs.
Same crew.
Home on time.

Most builders run the whole business out of their head. Rory holds it for you, so the jobs keep moving while you're on the tools.

In your headWith Rory
You're the only one who knows where each job is up to.Every job is tracked. You start the day with what needs you.
A job stalls for a week over one reply nobody chased.The chase is written before it stalls.
Extras slip, and notice windows close.Every extra hits the invoice, with the record behind it.
More work means another admin hire.Take on the next job, not the next hire.

Profit left on the table · Free, two minutes

Unwritten work walks profit out the door. Put your numbers on it.

Extras agreed in a thread and never invoiced. Hours on paperwork that shouldn't need you. Over a year, that's a number. One caught $5,000 extra covers a year of Rory for one person.

  • Walsh Building Co, Adelaide. $11,400 in extras caught in the first five weeks, across four jobs. Early pilot.
Get your number
Pricing

What it costs.

Rory is priced per person, not per business. One each for whoever's wearing the admin, on the inbox they already work out of.

Prices in AUD, per person. Founding rates while Rory's in private beta: the rate you start on is the rate you keep. Nothing is charged today.

Early bird

One person

Solo

$149 /mo $134 /mo billed yearly

Your own Rory, for the builder handling the admin themselves.

  • Emails, site notes and drawings watched for extras
  • Variations drafted from the job, priced from your rates
  • Chases written overnight. You tap send.
  • One Rory, every job you run

Custom

Enterprise

Let's talk

For larger offices that want a conversation first.

  • Set up around how your office runs jobs
  • Priced for the whole office
  • Same Rory, with a proper conversation first
Talk to us

Rory on Call is an optional add-on, per person, on top of these plans.

FAQ

Fair questions, straight answers.

AroFlo and Buildxact hold the job: quotes, claims, invoices — once someone remembers to put them in. They don't watch the inbox. They don't notice the extra buried in a thread, or the drawing that moved. That's a contract administrator's job, and most growing builders don't have one on every job. Rory is that person: it reads the email against the job, catches the extra before it slips, drafts the variation and the chase, and files it back into the system you already run. You tap okay.

No. Keep AroFlo or Buildxact, and the inbox you already live in. Rory sits on them. Nothing to migrate, no retraining. It never becomes the system you run the job in.

No. Never. Rory drafts everything and waits. Nothing gets sent, updated, or logged without you tapping okay. If that ever changes, you'll be the one to change it.

Most of them, you do. The ones that slip are the ones nothing told you about: a change agreed four replies in, a drawing revised with nothing marked. Builders who catch all of it have a contract administrator whose whole job is catching it. Rory is those eyes without the hire, and you still approve everything.

No. We'll still miss some, just far fewer. Anyone promising total capture is selling you something. What changes is that a miss becomes the exception you can see, not the default you can't.

No. Days, not months. Connect the inbox and the job system you already run. You'll see drafts the first week.

Rory is built first for the growing builder: roughly five to thirty people, already on AroFlo or Buildxact, with nobody whose whole job is the commercial side of a project. That's usually a project manager wearing the admin. Sometimes it's the builder. If a job doesn't justify another full-time person, you put Rory on it instead. One-off callouts with no extras have nothing here to catch.

Per person, not per business: one Rory for whoever's wearing the admin. There's a plan for one person, a plan for a crew that shares the jobs, and a conversation if you're a larger office. The rates, the currency and what you're actually signing up to are all on pricing, or see demo and we'll walk you through it.

Yes. You approve everything before it goes anywhere, and there's a record of what was agreed and when. Your data stays in your region.

Always. Email Kosta directly at kosta@folkware.com.au. No assistant. You'll hear back from the founder.

Why we do this

We sat with builders watching extras slip off the job.

Folkware builds software for the trades, from Adelaide. Extras leak before they reach a system. Rory watches the job, and Footing holds it.

You're here

Watches the job

A contract administrator, in software. It reads your emails, drawings, site notes and meetings, catches the variations and the RFIs, drafts the notices and the chases, and files them into the system you already run.

Holds the job

The layer under Rory. One system that holds the whole job, built by the same team so Rory runs deepest there. Optional: Rory works just as well on AroFlo or Buildxact.

See Footing

Built in Adelaide.

From the founder

Every builder should get paid for all the work they do. Not most of it. That's the belief Rory is built on.

There are plenty of tools for construction. You've probably got five of them. And the extras still slip, because the change lives in the inbox and nobody's watching it.

Rory isn't another piece of construction software. It's a set of eyes on the job you're too busy to watch, at a fraction of putting a person on it.

Here's what I keep seeing. Builders fix this by hiring. Extras still slip past a contract administrator, every salary thins the margin, and more people means more admin to keep in step. The fix makes the problem bigger. Rory keeps the whole job moving without adding a head.

The point of it: you get paid for everything you do, and you stop bringing admin home at night.

Got a question? Email me directly at kosta@folkware.com.au. No assistant. I read every one and I write back.

Kosta Canatselis
Kosta

See it on one of your jobs.

Nothing sends without you. Get your number Email Kosta

Join Waitlist See Demo